Apex System Installation Guide

For Chevron, Versailles and Herringbone pattern flooring. 3/4 inch thick engineered white oak.

What this guide covers. Apex System pattern flooring in Euro Character white oak, 3/4 inch thick with a 4 mm wear layer, tongue and groove on all sides, natural polyurethane finish. One box covers about 27.6 square feet and weighs about 65 pounds. Order 10 to 15 percent extra. Pattern floors use more cuts at the walls.

1. Before you start

Inspect every piece before it goes down. Check color, grade, finish and milling in good light. Do not install a piece you would not accept. Once a piece is installed, it is considered accepted by the installer and the owner.

Job site conditions

Tools and materials

2. Subfloor

The subfloor must be clean, dry, flat and solid. Most pattern floor problems start here.

Which method to use

SubfloorMethodNotes
Concrete slab (on, above or below grade)Full spread glue downTest the slab for moisture first. Use the moisture barrier system from your adhesive maker if readings call for it.
Plywood or OSB, 3/4 inch minimumFull spread glue downYou may add nails or staples through the tongue to hold pieces while the adhesive cures.
Solid board subfloorAdd plywood first, then glue downDo not install directly on boards. Cover with plywood underlayment, 1/2 inch or thicker, screwed down.
Radiant heatCall us firstPhone 816 702-2000 before you order adhesive.
Do not float this floor. Panels and pattern pieces must be bonded to the subfloor with a full bed of adhesive.

Moisture testing

3. Layout lines

Pattern floors are laid from the center of the room out to the walls, never from a wall. Walls are rarely straight or square.

  1. Measure the room and mark the middle of each end wall. Snap a chalk line between the marks. This is Line 1.
  2. Mark the middle of Line 1. Snap Line 2 through that point, square to Line 1.
  3. Check square with the 3-4-5 rule. Measure 4 feet along one line and 3 feet along the other. The distance between those two marks must be exactly 5 feet. If it is not, fix Line 2 before going on. In a big room use 6, 8 and 10 feet.
  4. Sight down the lines to the doorways and the main view into the room. Shift the lines if the pattern needs to line up with a doorway, fireplace or hallway.
4 ft3 ft5 ftLine 1 (center)Line 2 (square)Walls. Leave a 1/2 in. gap at every wall and fixed object.
Two chalk lines cross at the center of the room. The 3-4-5 triangle proves they are square.

Each pattern below starts from these two lines. Go to your pattern:

Chevron  |  Versailles  |  Herringbone

Adhesive rules for every step below.

4. Chevron

Chevron pieces have angled ends. The ends meet point to point and make a straight line of V shapes down the room. The boxes hold left pieces and right pieces. Sort them into two stacks before you start.

  1. Dry fit one left piece and one right piece into a V. Measure the width of one piece from point to point, square across. That is your column width.
  2. Use Line 1 as the center line. The points of the first V sit on this line.
  3. Snap a check line on each side of Line 1, one column width away. Add more check lines across the room at the same spacing.
  4. Screw a straight board to the subfloor along Line 1 as a temporary backer. It gives the first column something solid to push against.
  5. Spread adhesive for the first column on one side of the backer.
  6. Set the first piece with its angled end tight to the backer and its far point on the check line. Add the next piece above it, tongue into groove. Keep going one piece after the next down the room.
  7. After every 4 or 5 pieces, check that the outer points still touch the check line. Adjust now, not later.
  8. Let the first column grab. Remove the backer. Set the second column against the first so each pair of ends meets in a clean point on Line 1.
  9. Keep adding columns out to both walls. Check each column against its line.
  10. Cut the wall pieces last and leave the 1/2 inch gap.
Center line: points meet hereCheck lineCheck line
Chevron. The points of each V stay on a straight chalk line.
Tip. Start the first row of points at a full V at the most visible end of the room, such as the main doorway, and let the cut end fall at the far wall.

5. Versailles

The box holds 9.5 inch squares and sticks that are 3.55 inches wide and 22.55 inches long. The sticks weave around the squares. Each stick runs past two squares and crosses one joint. The next stick in line stops where a stick going the other way crosses.

  1. Sort squares and sticks into separate stacks. Mix pieces from several boxes.
  2. Dry lay a section about 4 feet square with no adhesive. Follow the picture below. Make sure every stick end butts tight against the side of a crossing stick.
  3. Measure your dry lay from the edge of one square to the same edge of the next square. It should be 13.05 inches (one square plus one stick width). Two repeats should be 26.1 inches.
  4. Snap a grid on the subfloor from Line 1 and Line 2 at every second repeat (26.1 inches) in both directions. These grid lines keep the weave square across the room.
  5. Spread adhesive in one grid box next to the center.
  6. Set the first stick just below Line 2 with its long edge on the line. Line 1 should cross it 9.5 inches from one end. Set the first square above Line 2, tight in the corner made by the two lines. The picture shows this starting spot.
  7. Add the sticks that cross it, then the next squares, following the picture. Engage every tongue and groove. Tap with a block.
  8. Work out from the center in a stair step, one grid box at a time. At each grid line, check that the pieces land on the line. Correct right away.
  9. Tape across joints with blue painter's tape while the adhesive sets.
  10. At the walls, cut squares and sticks to fit and leave the 1/2 inch gap. A straight border of sticks around the room makes a clean edge.
Line 1Line 2Grid repeats every 13.05 in.
Versailles. Squares sit in a grid. Sticks weave between them, each one crossing a single joint.
Watch the small joints. This pattern has many short joints. A little adhesive or grit in a groove will push the grid off. Keep grooves clean as you go.

6. Herringbone

Herringbone boards are 6.5 inches wide and 32.5 inches long with square ends. The end of one board meets the side of the next at 90 degrees, making a zigzag. If your boxes hold left and right boards (the tongue is on opposite sides), sort them into two stacks. Each zigzag uses one of each.

  1. Dry fit 6 to 8 boards in the pattern, with no adhesive, into one zigzag column.
  2. Snap a line through the outer corners on the left side of the column and another through the outer corners on the right side. Measure the distance between the two lines.
  3. On the subfloor, snap Line A and Line B that same distance apart, with Line 1 exactly halfway between them. Line 1 is now Line C, the center of the pattern.
  4. Cut a square of plywood about one board length on each side (32.5 inches). Screw it to the subfloor with one corner on Line C so its two edges run at 45 degrees to the line. This is your starter block.
  5. Spread adhesive in front of the starter block.
  6. Set the first board against one edge of the block. Set the second board against the other edge, with its end tight to the side of the first board. You now have the first V.
  7. Keep adding boards one side, then the other, working down the room. This is the zigzag course. Each board's outer corner must touch Line A or Line B.
  8. Check the corners against the lines every 3 or 4 boards. Tap boards back in line before the adhesive grabs.
  9. When the first course has set, remove the starter block and fill in behind it.
  10. Snap new working lines for the next course at the same spacing. Lay the next course tight to the first. Repeat out to both walls.
  11. Cut the wall pieces last and leave the 1/2 inch gap.
C (center)AB
Herringbone. Line C is the center of the pattern. Board corners touch Lines A and B.
Straight or diagonal. Herringbone can run with the room or at 45 degrees to it. Either way it needs a center line and two working lines.

7. Edges and finish

Care